The 2-Minute Rule for Fire-resistant materials
Nassif et al. presented the experimental observations and outcomes of an entire-scale fire-resistance take a look at on the partition wall. The partition wall was crafted inside a concrete frame and subjected to the regular fire check. The partition wall was manufactured with C-area steel studs, with gypsum boards fastened on both sides, as well as